Date: 2026-07-15
8153a352392e3cd4f0f38447fec005b27728be09.cargo +1.88 test --workspace: 164 tests passed.wasm-bindgen packaging succeeded.3892 (autodeploy.yaml) and 3893 (frontend.yaml) completed successfully.event-horizon/event-horizon rolled out image gitea.app.lan/eventhorizon/eventhorizon:sha-8153a352392e, revision 547, with 1/1 Ready./healthz returned ok; /readyz returned PostgreSQL and Qdrant ready.pull-refresh-20260715.Redeploy the preceding image associated with commit 73fc93619a2bb6509d867c0ac8131c6df94170df through the repository-managed deployment workflow.